Not yet registered? Create a OverBlog!

Create my blog

Pre-engineered buildings: The facts

Pre-engineered buildings allow a large part of the construction activity to be carried out off-site, thus offering an economic solution by cutting down the project duration.

Concept

Overview
A Pre-engineered building is basically a kit of parts with specified assembly details, fabricated to suit a range of design conditions.
They are fully fabricated in a factory under controlled conditions, transported as an inventory of components and assembled and erected on site.
Design considerations deal with spanning and loading criteria while also considering practical issues like convenience of transport and on-site assembly. The metal building is composed of primary structural framing members, secondary members (which support and fix the cladding) and the S panels. Typically the steel frame is in– I sections, castellated beams, or trusses.
Sheet materials may be fibreglass, galvanized iron or pre-coated sheets.

Benefits

Advantages
Since fabrication is an off-site activity, it can be simultaneous with other activities and cut down project time by 30 to 40 per cent.
Savings in design costs and economies of mass production also make it an economic option. It is an ideal solution in partially occupied sites, since it limits the disturbance to existing activities by speeding up construction. The customer enjoys the benefit of procuring the entire building from a single source.
The building can be dismantled and relocated.
Most materials can be reused and the modular basis allows easy expansion. Variety in panels, colours and finishes allows variations in aesthetic appearance. Prefabricated insulated panels are also available and help in energy savings by offering thermal insulation.

Concerns and safety measures

Safety
The building requires careful integration with the physical system of the site and services like power, ventilation, water supply and fire fighting.
It is imperative to adhere to manufacturer’s data regarding design loading and standard assembly details while also checking for compliance with local building rules.
All finishes may not be included and requiring further work on finishes and fit-outs. Requisite fire protection, an area of weakness in steel buildings and particularly relevant to optimized sections, can entail higher costs. Despite available variety, they can have a monotonous and industrial look.

Application

What are they ideal for?
They are ideal for spaces which require clear spans and have a modular, repetitive plan.
Transport structures like railway stations and aircraft hangars, industrial buildings, warehouses, service stations and agricultural buildings are common examples. This technology has extended to showrooms, retail outlets and office buildings. Portable office cabins are regularly used on construction sites.
In the residential sector, pre-engineered systems are common in garden structures, greenhouses, garages and carports. Final word
Smaller components of buildings such as canopies, mezzanine floors and stairs may also be pre-engineered.

Same category articles Architecture

An introduction to studying architecture

An introduction to studying architecture

Architectural practice involves a number of diverse design areas which includes not only the design of individual buildings, but also clutches of buildings and it even extends to designing the surrounding landscape and interior design. architects are often employed to supervise the construction of their designs. this is but one of the reasons why this can be a great career option. here is a guide to studying architecture.
What is SOA?

What is soa?

Whilst the area of service-oriented architecture, or soa, is currently a highly active area, there still remains some considerable confusion with regards to what soa actually is. as you will see in the following article, different people tend to qualify soa in quite different ways. with that in mind, have a look at the various soa definitions.
A history of the Eiffel Tower

A history of the eiffel tower

The eiffel tower sits tall and high in the centre of paris and was erected over one hundred and twenty years ago. it took over three hundred men to put the tower together as the spire reaches three hundred and twenty metres in to the sky. this article explains the history of the world famous landmark in a timeline format of the most significant events.